22
5
P
4
3
1
2
6
2
8
7
Required devices
Pos.
Description
1
Heat pump
2
Primary pump (installed and connected)
3
Geothermal probes/geothermal collectors
4
Brine distributor for geothermal probes/collectors
5
Brine accessory pack
6
Brine pressure limiter (accessory, if no brine pressure limiter is connected,
insert a jumper across terminals 1X3.8 and 1X3.9 prior to commission-
ing)
7
Frost protection monitor of the AC-Box (if an AC-Box is connected, con-
nect the frost protection monitor in series with the brine pressure limiter)
8
Integral control unit
Note
For further information regarding the ter-
minal markings and PCBs, see
page 61.
Preparing for installation
Connections on the primary side type BWC (brine/water)
5368 522 UAE
Содержание Vitocal 300-G BW
Страница 57: ...57 6 1 2 4 3 5 A 5x Installation sequence Opening the heat pump 5368 522 UAE Installation...
Страница 188: ...188 VITOCAL 300 205 025 011 203 202 200 206 207 204 201 010 025 A 026 Parts lists Parts lists type BWC cont 5368 522 UAE...
Страница 194: ...194 VITOCAL 300 205 203 202 200 206 207 204 201 010 026 025 A 025 Parts lists Parts lists type BW cont 5368 522 UAE...
Страница 213: ...213 5368 522 UAE...
Страница 214: ...214 5368 522 UAE...
Страница 215: ...215 5368 522 UAE...