61
Installed positions of the PCBs
X8
X11
X1
X2 X3
T6.3A
X2 X1
X7
A
B
C
D
A
PCB 3 (sensor PCB)
B
PCB 2 (main PCB)
C
PCB 1 (cross connect circuit board)
with control unit fuse
D
Entry area for cables
Note
The terminal markings are preceded by
figured 1 to 3. These figures are alloca-
ted to the 3 PCBs.
Installation sequence
Overview of power connections
(cont.)
5368 522 UAE
Installation
Содержание Vitocal 300-G BW
Страница 57: ...57 6 1 2 4 3 5 A 5x Installation sequence Opening the heat pump 5368 522 UAE Installation...
Страница 188: ...188 VITOCAL 300 205 025 011 203 202 200 206 207 204 201 010 025 A 026 Parts lists Parts lists type BWC cont 5368 522 UAE...
Страница 194: ...194 VITOCAL 300 205 203 202 200 206 207 204 201 010 026 025 A 025 Parts lists Parts lists type BW cont 5368 522 UAE...
Страница 213: ...213 5368 522 UAE...
Страница 214: ...214 5368 522 UAE...
Страница 215: ...215 5368 522 UAE...