14
••••
Installation
XX002 Rev 799 Surveyor99 Dome System
The ceiling material must provide a
surface of suitable strength for the
Surveyor99 weight of 4.5 lb (2.0 kg) on the
area of the two Ceiling Clips. Refer to the
Optional Independent Support
sub-section
for installations requiring additional
support.
1. Cut a 7-3/8-inch (187 mm ) diameter
hole in ceiling at the desired location.
Feed all Flexible Conduit Pipe or
cables down through the hole.
2. Remove the Camera Drive from the
Enclosure by loosening the 3 Captive
Screws.
3. If cables are used without the use of
Flexible Conduit:
a) Remove the Enclosure Top Cover by loosening the 3 screws and lifting it off. Then remove the
Conduit Fitting by loosening the Nut and sliding it out. Install the supplied Strain Relief Fitting in its
place and re-attach the Top Cover.
b) Hold the Enclosure near the hole in the ceiling and route approximately 9 inches (229 mm) of cables
through the Strain Relief Fitting. Tighten the 2 Strain Relief Fitting screws to compress the cables. Do
not over-tighten the screws and crush the cables.
NOTE: Connectors that do not fit through the Strain Relief Fitting must be cut off and re-terminated after
passing the cable through. It is recommended to pass any RJ-45 Connectors through the fitting first.
BNC type connectors do not fit through the fitting and must be terminated later.
3. If cables are channeled through Flexible Conduit:
a) Hold the Enclosure near the hole in the ceiling and route approximately 9 inches (229 mm) of Conduit
cables through the Conduit Fitting.
b) Insert the end of the Flexible Conduit Pipe into the Conduit Fitting and tighten the Clamp Screw.
NOTE: Connectors that do not fit through the Conduit Fitting must be cut off and re-terminated after passing
the cable through. It is recommended to pass any RJ-45 Connectors through the fitting first. BNC type
connectors do not fit through the fitting and must be terminated later.
4. Lift the Enclosure up and snap it into the ceiling hole. Tighten the Ceiling Clip Screws to obtain a flush fit
with the ceiling plane.
5. Connect the Latch of the Camera Drive to the Enclosure’s Safety Cord Clip.
6. With the Camera Drive hanging from the Enclosure, terminate all the cables as follows:
a) Remove Terminal Blocks TB1 and/or TB3. Since the control signals exist in both TB3 and J3, do not
remove TB3 if J3 will be used for control signal wiring.
Figure 14
Typical use of Accessory Kit
Содержание Surveyor 99
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 6: ......
Страница 38: ...28 Installation XX002 Rev 799 Surveyor99 Dome System NOTES...
Страница 48: ...38 Wiring XX002 Rev 799 Surveyor99 Dome System NOTES...
Страница 52: ...42 Configuration XX002 Rev 799 Surveyor99 Dome System NOTES...
Страница 54: ...44 Disassembling the Surveyor99 XX002 Rev 799 Surveyor99 Dome System NOTES...
Страница 58: ...48 Operation XX002 Rev 799 Surveyor99 Dome System NOTES...
Страница 60: ...50 Maintenance XX002 Rev 799 Surveyor99 Dome System NOTES...
Страница 62: ...52 Shipping Instructions XX002 Rev 799 Surveyor99 Dome System NOTES...