Boiler commissioning
1. Making fire in the boiler.
−
Connect the equipment to the mains (insert plug into the socket).
−
Put the main switch (circuit breaker) in the service box into the 1 position.
−
Check whether QAA 88 device is switched off or switch it off by means of OK key; cursor will move
into ON/OFF position. QAA 88 device will be switched off.
−
Check setting of parameters see chap. 5.4.
−
On the pressure gauge check volume of water in heating system.
−
Open the stop valves between boiler and heating system.
−
Check the pumps functionality (mechanical spinning, then according to parameters: primary pump (P
50, P 51), pump HC (P 55, P 56), pump HW (P 59, P 60)).
−
Clean the burner and ash-pan drawer (in case fire isn’t made for the first time). Ash-pan door during
fire making and boiler operation must be permanently closed.
−
Fill the fuel reservoir with specified fuel and then close the reservoir carefully in order to prevent
possible air intake into the burner through the feeder.
−
By pressing the green button on the service box put the fuel feeder for fuel feed to burner manually
into operation. Fuel must be supplied approx. 2 cm under the edge of the cast iron grate. In case twe
start with an empty fuel feeder the fuel transport to burner will last 6 – 6,5 min. After 6 minutes the
feed screw is automatically switched off and if required then by pressing the green button again it is
put into operation. By pressing the green button again the fuel feeder is switched off.
−
Put the kindling e.g. paper, wood chips, PEPO, solid alcohol etc. on the fuel.
−
Ignite and let flare up.
−
Shovel a small volume of specified fuel to the burning kindling.
−
Close the door and switch on the ventilator by means of blue button in the service box (the ventilator
run is signalled by flickering cursor above the ventilator symbol). Through the door choker the fuel
flaring can be checked. As necessary the ventilator can be switched off by pressing the blue button
and if it be to the contrary the ventilator is automatically switched off after 15 minutes. When making
fire the ventilator is set to 50 % nominal ventilator output (set by the manufacturer). In case the fuel
has changed for wood pellets this output must be set to 20 % (parameter P 22).
−
When making fire the height of fuel must be kept approx. 2 cm under the edge of the cast iron grate.
−
If after 15 minutes the fuel is sufficiently flaring switch on QAA 88 device by pressing the right-hand
key ESC and cursor will move into Auto position
−
If after 15 minutes the fuel does not flare up sufficiently switch on the ventilator again for the
necessary period of time and then switch on QAA 88 device by the right-hand key ESC; the cursor
will move into Auto position
−
Now the boiler is in the automatic regime.
−
WARNING! If before the QAA 88 device turning–on the ventilator is still switched on in the
manual regime, (display of QAA 88 device is flickering i.e. 15 minutes have not elapsed since
pressing the blue button) switch off the ventilator by means of blue button and only then
switch on the QAA 88 device.
2. Check again the boiler tightness.
3. Do the stoking test according to the relevant standards (see the Guarantee certificate)
4. Make the user acquainted with operation.
5. Make a note in the Guarantee certificate.
Assembly determining and heat proving must be noted in the „Letter of Guaranty“.
Operation
Check of shape of flame (fuel: brown coal)
The shape of flame gives us information about the correct setting of boiler to the rated output. You are
advised to check it with each purchase of a new coal:
-
When checking the shape of flame, make sure that the boiler is set to the rated output (the QAA device
88, line P 12 - Displayed Value 100) - see. Chap. 6. 2 If this value is lower, set a fixed boiler operation
(line P 24 - choose the value of 1 (transfer to fixed set temperature of 70 ° C). Check the setting on the
line P 12.