19
5.2.5 Mounting of the service board to the fuel reservoir
Fig. no. 14
Mounting of the service board to the fuel reservoir
1.
Screw the service board to the side of fuel reservoir.
2.
Carry out the wiring system according to diagram in chap. 5.2.9. Lead the cables by means of spacing
fasteners gripped to the side of fuel reservoir.
3.
To stick the sticker – LED of the safety thermostat signalization (5) on the switchboard (1).
5.2.6 Mounting of cleaning tools
The ordinary assembly tools and leather gloves are to be used for mounting and demounting of the brush and
spike on tang (if it is included in the delivery).
5.2.7 Assembly of the emergency fire extinguishing equipment
In the cover of the cleaning opening there is a pipe for water supply with 1/2“ connection which serves for TS
130 (STS 20) valve interconnection. The interconnection is to be carried out by means of a flexible (stainless)
hose. It must regard a detachable connection of the valve with a pipe in the cover of the cleaning opening by
reason of the possibility of disassembly. The valve sensor is to be installed in the sensor holder which is
positioned on the fuel feeder.
The function of the emergency fire extinguishing equipment :
In case of fire penetration to the feeder (temperature on the feeder reaches 95
o
C), TS 130 (STS 20) valve
switches on the cold water supply to the hopper and the burning fuel is extinguished; then the water supply is
stopped. Then it is necessary to dismantle the engine with the worm shaft and stainless insert and clean
them. It is followed by the reassembly. Check the valve: if it still lets water into the reservoir replace the valve.
1.
Service board
2.
Screw M6 x 16 (4 pcs)
3.
Washer 6,4 (4 pcs)
4.
Nut M6 (4 pcs)
5.
Sticker – LED of the safety
thermostat signalization