OPERATORS MANUAL
ORION II
Orion II 500-10000 Operators
Page 80 of 95
Manual Part no: DOMAON0100 Issue A
April 2008
during start up and plant validation, but thereafter less frequently once the system has reached
stable operation. This is therefore at the discretion of the user.
Examples of log sheets are provided in the Appendix and are available electronically from Veolia
Water and should be tailored to specific customer requirements. The content of the log sheets also
depends on what optional equipment (if any) is included.
Monitoring therefore consists of
A daily check of equipment for leaks, overheating or other faults
A daily check of the CEDI flows and pressures, adjusting to the values laid out in the Technical
Data and Process Description sections if necessary
Filling in the appropriate daily and weekly log sheets
Assessing the results and taking appropriate action