OPERATORS MANUAL
ORION II
Orion II 500-10000 Operators
Page 87 of 95
Manual Part no: DOMAON0100 Issue A
April 2008
does not mean that it is safe to return the unit to production at this point, it is the responsibility of
the user to determine when the unit has been sufficiently rinsed to be put back into production.
The „Acknowledge Action Performed‟ button can be used to step though timed stages.
Pressure, flow rate and temperature limits are active during CIP. Non-fatal and fatal alarms will
be raised if these limits are exceeded.
A fatal alarm raised during CIP will shut the system down. Once this has been cleared the user
will be able to restart the CIP from the HMI.