manualshive.com logo in svg
background image

Supplementary installation, operating and maintenance instructions  English 

Explosion-proof three-phase asynchronous motors with squirrel-cage rotor for high voltage 

 
 

 
815001 Edition 09.2020                                                                                                                                                                                                                                                                                                                                                                                                         
 

23 

Annex 3 
 
Pre-purge before start 

Supplement to the operating instructions for explosion-protected electrical machines of ignition protection 
types “ec” (only for atmospheres in Zone 2) with operating mode other than S1 or S2 and rated power over 
100 kW and increased safety “eb”.  
See also sections 3 and 5 “Ignition risk assessment”. 
High-voltage electric machines in the W52R series have connections for pre-purging. A pre-purge must be 
carried out according to section xx or xx.  
Protective functions: 
The “pre-purge” system ensures that there is no explosive gas inside the motor when the motor starts. If 
there is explosive gas inside the motor , there is a risk of explosion during start-up.  
The “pre-purge system” does not correspond to the ignition protection type “pressurised enclosure” Ex p II 
according to IEC/EN 60079

–2, especially its pre-purging conditions.  

 
System description 
One flange in the motor for inert gas supply / one flange in the motor for gas discharge (for pre-purging). 
The position of the flange is determined by the motor manufacturer. 
Before putting the motor into operation, the free volume of the motor enclosure must be purged with inert 
gas, if necessary after ignition risk assessment. After the purging phase, the input and output valves are 
closed. There is no monitoring of the internal pressure. 
One or two mechanical blow-off valves are fitted on the top of the motor. 
Response pressure in the purging phase 3-20 mbar. 
Inert gas supply e.g. via the following devices (input)/ball valve/controller with filter/pressure reducing 
valve/safety valve/manometer 
 
The devices for inert gas supply and gas outlet are not included in the scope of delivery. 
They are only supplied by the motor manufacturer on special order. 
Processed plant compressed air can also be used as inert gas. 
When starting the motor, the interior of the motor must be filled with inert gas. 
The purging time depends on the available inert gas volume (dm3/min) and the motor enclosure volume. The 
required purging time must be determined before initial operation. 
 
If the purging system contains electrical equipment, it must be tested and certified by an approved test centre 
when used in potentially explosive atmospheres. The relevant installation regulations and national regula-
tions must be observed. Special attention must be paid to the operating instructions of the devices used! 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание W52R 355 Series

Страница 1: ...g and maintenance instructions Explosion proof three phase asynchronous motors with squirrel cage rotor for high voltage Ignition protection types Increased safety eb and ec Protection by enclosure t...

Страница 2: ...ge First edition 09 2015 11 2015 Annex 2 Update of EU Declaration of Conformity 01 2016 Change of section 5 7 to 5 8 Section 5 7 entry parts new Annex 4 new Change in the wording for the heating ca bl...

Страница 3: ...3 Risk assessment with regard to possible sparking in Ex eb IIC 3 Information about ignition protection type increased safety ec 3 1 Protective principle labelling 3 2 Risk assessment with regard to...

Страница 4: ...make changes to the product the technical data or the assembly operating and maintenance instructions without prior notice Designs technical data and illustra tions are only ever binding with written...

Страница 5: ...ng to IEC EN 60034 5 for motors used in zones 1 2 and 22 is a minimum of IP 55 For use in zone 21 the motors are designed to meet IP 65 as a minimum Only electrical machines with the approved type of...

Страница 6: ...erved 1 6 Transport and storage Any damage detected on delivery must be reported to the transport company immediately if necessary commissioning must be prevented Transport eyes attachment points are...

Страница 7: ...ain the temperature class and the permissible operating temperature The motor must not be enclosed Compare current type mains voltage and frequency Pay attention to the circuitry Observe rated current...

Страница 8: ...ions When inserting the supply cables into the terminal box make sure that the cables have strain relief The in side of the terminal boxes must be kept clean The seals must be undamaged and correctly...

Страница 9: ...eration If there are changes compared to normal operation e g increased tempera tures noises and vibrations the machine must be switched off in case of doubt The cause must be determined and the manuf...

Страница 10: ...ating manual must be observed Operation from the frequency inverter for use in zone 2 22 Ex II 3G Ex II 3D Operation with the frequency inverter is only permitted within the operating points specified...

Страница 11: ...ts are stated on the rating plate or on the EC Type Examination Certificate If the certificate number ends in an X special conditions on the EC Type Examination Certificate must be observed Electrical...

Страница 12: ...gap with squirrel cage rotors A risk assessment has been carried out by the manufacturer regarding possible sparking in the air gap of squirrel cage rotors If the sum of the factors is greater than 6...

Страница 13: ...tures of surfaces on which dust may be deposited or which may come into contact with a cloud of dust are kept below the temperatures specified in this standard All parts with electrical sparks or temp...

Страница 14: ...ox optional star point box The stator housing with feet is made of grey cast iron the bearing plates and terminal box are made of grey cast iron For high voltage motors a welded steel construction is...

Страница 15: ...connections must then be assembled with locking nuts taking into account the thickness of the plate The diameter of these through holes must be selected in accordance with DIN EN 50262 5 8 Standstill...

Страница 16: ...layers of dust lead to a temperature increase on the surface of the motor Dust deposits on motors and even their complete filling with dust must there fore be avoided as far as possible by appropriate...

Страница 17: ...t therefore be strictly observed by taking the following steps among others Limiting the total paint or resin layer thickness according to the explosion group to IIA IIB Total coating thickness 2 mm I...

Страница 18: ...ts list may be used this applies in particular to seals and connecting parts The following information is required when ordering spare parts Spare part designation Motor type Motor number 12 Disposal...

Страница 19: ...allation operating and maintenance instructions English Explosion proof three phase asynchronous motors with squirrel cage rotor for high voltage 815001 Edition 09 2020 19 13 Terminal box construction...

Страница 20: ...5 4 1 5 5 1 5 6 1 5 7 1 5 8 1 5 9 1 5 10 1 5 13 1 5 15 1 6 1 1 6 5 1 7 2 1 7 4 1 Die Inbetriebnahme der unvollst ndigen Maschine ist solange untersagt bis die Konformit t der Maschine in welche die un...

Страница 21: ...Supplementary installation operating and maintenance instructions English Explosion proof three phase asynchronous motors with squirrel cage rotor for high voltage 815001 Edition 09 2020 21 Annex 2...

Страница 22: ...Supplementary installation operating and maintenance instructions English Explosion proof three phase asynchronous motors with squirrel cage rotor for high voltage 815001 Edition 09 2020 22...

Страница 23: ...tion of the flange is determined by the motor manufacturer Before putting the motor into operation the free volume of the motor enclosure must be purged with inert gas if necessary after ignition risk...

Страница 24: ...d on the equipment rating plate or terminal box Alternatively the number and position of the entry threads are indicated on the dimension drawing of the mo tor Unless otherwise ordered cable glands fr...

Страница 25: ...instead be approved according to IECEx or if selected by the plant operator they must be approved according to IECEx The motors are labelled as IECEx compliant For IECEx approved motors references to...

Отзывы: