70
110332-04 - 2/23
PHTM II
Installation, Operating & Service Instructions
Figure 17-1: Ignitor/Flame Sensor Location
17
Service and Maintenance
(continued)
4.
Inspect target wall and burner door insulation.
If either shows signs of damage, it must be
replaced.
5.
Inspect burner door seal.
Look for signs of embrittlement or deterioration.
Replace if needed.
6.
Inspect burner.
Look for heat damage or other deterioration. Use
a nonmetallic brush or source of compressed
air to clean off dust or debris from ports. Ensure
burner is secured tightly to burner door.
7.
Inspect ignitor/flame sensor.
A. Clean off any deposits found with steel wool.
Do not use sand paper or Emory cloth for this
cleaning.
B. Inspect ceramic portion for cracks and
replace ignitor/flame sensor if any are found.
C. Verify ignitor/flame sensor spark gap is within
range shown in Figure 17-2.
Figure 17-2: Ignitor/Flame Sensor Spark Gap
.16" (4mm) - .19" (5mm) Gap
D. Verify gap between ignitor/flame sensor and
burner is within range shown in Figure 17-3
and Table 17-4.
WARNING
Asphyxiation Hazard.
Do not operate boiler without condensate trap
ball and ball support in place. Doing so could
cause products of combustion and or carbon
monoxide to enter building resulting in severe
personal injury, death or substantial property
damage.
!
Figure 17-3: Ignitor/Flame Sensor to Burner Gap
8.
Inspect blower gas valve assembly.
A. Look for dust, lint, or other debris that may
have been drawn into this assembly.
Excessive deposits may be vacuumed out.
B. Inspect all rubber and plastic components
on blower/gas valve assembly, looking for
deterioration. Replace blower and/or gas
valve if deterioration is found.
9.
Inspect and clean condensate trap.
A. Place bucket under condensate clean out cap
on bottom of boiler (Figure 17-5) to catch
water in trap as well as ball and support.
B. Unscrew cap, being careful not to lose ball or
ball support.
C. Flush any debris found in trap with water - do
not use other cleaning agents. Reassemble
trap as shown in Figure 17-5.
.16 in. (4mm) - .19 in. (5 mm) Gap
Burner Door Mounting
Nuts (4X)
Ignitor/Flame
Sensor
Table 17-4: Electrode Gap
Boiler Size
Gap A
120
.32 in. (8 mm) - .52 in. (13 mm)
120(B)/150/180
.36 in. (9 mm) - .56 in. (14 mm)
150/180
(LP above 2,000 ft. (610 m))
.59 in (15 mm) - .79 in. (20 mm)
Gap "A"
Содержание PHTM2080H
Страница 101: ...101 110332 04 2 23 PHTM II Installation Operating Service Instructions SERVICE RECORD SERVICE PERFORMED DATE...
Страница 102: ...102 110332 04 2 23 PHTM II Installation Operating Service Instructions SERVICE RECORD SERVICE PERFORMED DATE...
Страница 103: ...103 110332 04 2 23 PHTM II Installation Operating Service Instructions SERVICE RECORD SERVICE PERFORMED DATE...