14
110332-04 - 2/23
PHTM II
Installation, Operating & Service Instructions
6
Preparing Boiler
Remove boiler and parts carton from outer shipping
carton.
CAUTION
Heavy Object.
Boiler weighs up to 130 lb. (59 kg). Two people
are required to lift boiler onto wall mounting
bracket. Ensure wall bracket is anchored
to structure capable of supporting weight of
boiler and attached piping when filled with
water. Areas subject to earthquakes may have
special requirements that take precedence over
requirements in these instructions.
!
Unpack Boiler
Figure 6-1: What's In The Box
CAUTION
Boiler Damage.
• Do not attempt to lift boiler using water or gas
pipe connection as hand holds.
• Do not drop boiler. Damage to boiler can
result.
• Do not rest boiler on bottom with side panels
removed. Boiler should be hung from wall
bracket.
!
What's In The Box (service part shown)
107160-01 Vent connector 2 in.
110882-01 Wall bracket and clips
108215-01 Temperature and pressure gauge
110878-01 DHW connection fittings (2) metric to copper
111422-01 Adapter gas metric to 1/2 in. NPT
109038-01 Relief valve 30 PSIG
Boiler pump Grundfos 26-99 (obtain locally)
Pump flanges 1 in. (2) obtain locally
Содержание PHTM2080H
Страница 101: ...101 110332 04 2 23 PHTM II Installation Operating Service Instructions SERVICE RECORD SERVICE PERFORMED DATE...
Страница 102: ...102 110332 04 2 23 PHTM II Installation Operating Service Instructions SERVICE RECORD SERVICE PERFORMED DATE...
Страница 103: ...103 110332 04 2 23 PHTM II Installation Operating Service Instructions SERVICE RECORD SERVICE PERFORMED DATE...