43
110332-04 - 2/23
PHTM II
Installation, Operating & Service Instructions
12
Field Wiring
DANGER
Electrical Shock Hazard.
•
Disconnect electrical supply before
installing or performing maintenance.
• Electrical power may be supplied
from more than one circuit.
•Lock out all electrical boxes with padlock once
power is turned off.
!
WARNING
Electrical Shock Hazard.
All wiring and grounding must conform to
requirements of authority having jurisdiction or,
in absence of such requirements, to National
Electrical Code/NFPA 70 or Canadian Electrical
Code, Part 1 (CSA C22.1 - latest edition).
•
Make electrical connections according
to boiler's wiring diagram and instructions.
Failure to properly wire electrical connections
to the boiler may result in severe personal
injury, death or substantial property damage.
•
Protect each boiler circuit with a
properly sized over-current device.
•
Never jump out or bypass any safety or
operating control or component of this boiler.
!
NOTICE:
Internal wiring diagrams contained in
this manual are for reference only. Each boiler is
shipped with a wiring diagram sheet within boiler
literature packet. Read, understand and follow this
wiring diagram and wiring diagrams of any field
supplied controls.
NOTICE:
Boiler is equipped with a UL 353 listed
high water temperature limit. This limit provides
boiler shutdown in event boiler water temperature
exceeds setpoint of control. Certain local codes
require an additional water temperature limit. If
necessary, install an additional water temperature
limit (Honeywell L4006 Aquastat). Wire as
indicated in Figure 12-3.
Locating Field Connection Terminal Strips
Field connection terminal strip locations are shown in
Figure 12-1. To access terminal strips:
1. Remove front door. Front door is removed by
first loosening two thumb screws located
under front of door.
2. Disconnect igniter wire at burner door.
3. Pull control enclosure forward, then to the left and
allow it to swing down into the service position.
Figure 12-1: Location 120 VAC and Low Voltage
Connection Boards
Field 120 VAC Connections
1. Provide a dedicated circuit for boiler of 15A
or greater. A service switch is recommended
and is required by many local codes.
Locate this switch in accordance with local codes
or, in absence of such requirements, in a location
where it can be safely accessed in an emergency.
2. All 120 VAC connections to boiler are made on
120 VAC Connections terminal strip (see Figure
12-2) located on right side of bottom panel. Route
all 120 VAC wiring through conduit knock out
holes located on right side in front of terminal strip.
Содержание PHTM2080H
Страница 101: ...101 110332 04 2 23 PHTM II Installation Operating Service Instructions SERVICE RECORD SERVICE PERFORMED DATE...
Страница 102: ...102 110332 04 2 23 PHTM II Installation Operating Service Instructions SERVICE RECORD SERVICE PERFORMED DATE...
Страница 103: ...103 110332 04 2 23 PHTM II Installation Operating Service Instructions SERVICE RECORD SERVICE PERFORMED DATE...