Ethernet
© VeEX Inc. All Rights Reserved.
136
Summary
The summary screen lists the source, destination and VLAN information of each stream. Tap on the appro-
priate box of each tab to reconfigure the source, destination, or VLAN information if desired.
Throughput Test - Summary (MAC List)
Starting/Stopping a Throughput (Multiple Streams) Test
Once all configurations have been made, the user can start the Throughput test (press the
Start
icon on the top
right section of the screen). The following are three scenarios of how to prepare and start the unit for Through-
put testing.
If testing on the fiber ports, make sure the LASER is turned On before starting the test.
l
End-to-End Testing
l
Connect the test set to another unit that supports BERT testing.
l
After configuring test settings on both units, start the tests.
l
Far-End Unit in Manual Loopback Mode
l
If the far-end unit (another MX) is already in a manual loopback mode, do not send a loop up
command since it is not necessary.
l
Once the correct control settings are configured, the user can start the test.
Содержание MTX150 Series
Страница 1: ...MTX150x User Manual Multi Service Installation Maintenance Test Set P N D07 00 148P Rev B00 ...
Страница 11: ...Customer Care 303 Table of Contents VeEX Inc All Rights Reserved 11 ...
Страница 171: ...171 VeEX Inc All Rights Reserved Ethernet V FTP Setup Download V FTP Download Results SyncE ...
Страница 246: ...Common Functions VeEX Inc All Rights Reserved 246 Bluetooth Devices Bluetooth Scan ...
Страница 248: ...Common Functions VeEX Inc All Rights Reserved 248 Bluetooth Devices Bluetooth Scan ...
Страница 267: ...267 VeEX Inc All Rights Reserved Common Functions ...
Страница 300: ...Software Update Pro cess VeEX Inc All Rights Reserved 300 Software Version is displayed in the About section ...