Installation instructions for geoTHERM exclusive VWS 0020051614_00
46
7 Start-up
d
Danger!
Risk of injury!
The heat pump may only be put into op-
eration after all the cladding sections
have been fitted.
7.1
General points regarding start-up
• Before putting the heat pump into operation, first
check the Start-up Checklist in Chap. 14.
The heat pump may only be started if all the points
noted there have been satisfied.
Before you actually start up the heat pump, familiarise
yourself with the controller interface described below.
7.2 Operating
the
controller
7.2.1
Finding your way around the controller
Basic data
Date
Day of week
Time
Set day
2
1
3
4
5
6
Fig. 7.1 Operating overview
Key
1 Menu
name
2 Cursor indicates the selected parameter
3 Menu
number
4 Dial ,
position parameter (turn), select parameter (press)
5 Dial
,
select menu (turn), activate special operation (press)
6 Information line (in the example a handling request)
7 Start-up