RDA 400S
27.06.2011
ver.2
21
3.3
Hitching and unhitching the seed drill with an interme-
diate packer
3.3.1
Hitching
1 Connect the drill to the tractor lifting arms. The Class 3 screw taps must be used.
Figure 3.8
2 Fold the hose holder forward and connect the hydraulic hoses and electrical cabling, see also
3.4 Connecting the hydraulic hoses and electrical cables” on page 22
.
3 Check that the hoses and cables are hanging free, even during sharp turns, see also ”
length and hose holder adjustment” on page 24
.
!
After connection of the intermediate packer, the tractor lifting arms should be locked using the
side stabiliser stays.
!
The driving instructions for the intermediate packer are given in ”
.
Figure 3.6
Figure 3.7
3
Содержание Rapid RDA 400S
Страница 2: ...2 27 06 2011 ver 2 ...
Страница 4: ...4 ...
Страница 16: ...Safety regulations 16 27 06 2011 ver 2 ...
Страница 28: ...Instructions and settings 28 27 06 2011 ver 2 3 8 Horizontal alignment Figure 3 22 C B A ...
Страница 89: ...RDA 400S 27 06 2011 ver 2 89 ...
Страница 91: ...RDA 400S 27 06 2011 ver 2 91 Figure 5 4 ...
Страница 97: ...RDA 400S 27 06 2011 ver 2 97 ...
Страница 136: ...Appendices 136 27 06 2011 ver 2 ...
Страница 137: ......