6
•
vacon
receipt of delivery
Tel. +358 (0)201 2121 • Fax +358 (0)201 212205
2
2.3 Maintenance
In normal operating conditions, Vacon 10 frequency converters are maintenance-
free. However, regular maintenance is recommended to ensure a trouble-free oper-
ating and a long lifetime of the drive. We recommended to follow the table below for
maintenance intervals.
2.3.1 Capacitor recharge
After a longer storage time the capacitors need to be recharge in order to avoid ca-
pacitor damage. Possible high leakage current through the capacitors must be lim-
ited. The best way to achieve this is to use a DC-power supply with adjustable current
limit.
1) Set the current limit to 300…800 mA according to the size of the drive.
2) Then connect the DC-power supply to the input phase L1 and L2.
3) Then set the DC-voltage to the nominal DC-voltage level of the (1.35*Un AC) and
supply the converter for at least 1 h.
If DC-voltage is not available and the unit has been stored much longer than 12
months deenergized, consult the factory before connecting power.
Maintenance interval
Maintenance action
Whenever necessary
• Clean headsink
Regular
• Check tightening torques of terminals
12 months (If stored)
• Check input and output terminals and con-
trol I / O terminals.
• Clean cooling tunnel.
• Check operation of cooling fan, check for
corrosion on terminals, busbars and other
surfaces.
6 - 24 months (depending on environment)
• Chang cooling fans:
• Main fan
• Interminal fan
5 - 7 years
• The
motor cables
should cross other cables
at an angle of
90 degrees
.
Содержание 10
Страница 1: ......
Страница 17: ...14 vacon installation Tel 358 0 201 2121 Fax 358 0 201 212205 3 MI1 MI3 3P 230 V POWER LOSS ...
Страница 18: ...installation vacon 15 24 hour support 0 201 212 575 Email vacon vacon com 3 ...
Страница 19: ...16 vacon installation Tel 358 0 201 2121 Fax 358 0 201 212205 3 MI1 MI3 1P 230 V POWER LOSS ...
Страница 20: ...installation vacon 17 24 hour support 0 201 212 575 Email vacon vacon com 3 ...