15
Section 3 Installation
3.1 Introduction
The installation consists of:
•
Assembling the URG-3000N Stand and attaching the Module C and Controller Module.
•
Installing the module inlet.
•
Connecting the cables between the controller, Module C, and Pump.
•
Connecting the vacuum hoses between the Module C and Pump.
•
Selecting the sampling parameters.
•
Calibrating the flow rates of the Modules
3.2 Packing List
The following list details all of the individual boxes that the URG-3000N ships in, and the contents of each
box. Note that the box labels are in bold, and all quantities are one (1) unless noted otherwise.
•
Module C Box
o
Module
C
o
20” 12-pin Standard Control Cable for attaching Module C to Controller and Mass Flow
Controller
o
Temperature Probe (Partially Installed in Inlet Tee)
o
Leak Check (Flow Audit) Assembly:
Downtube Reducer (1.5”ID to 1.25”OD),
Leak Check (Flow Audit) Adapter (1.25” to brass hose barb with shutoff valve)
Pump shutoff valve
Audit cassette cartridge tray.
o
Inlet
Cap
o
Roof Flashing for Inlet
o
Copy of inspection and status checklist.
•
(Optional) Collocated Module C Box
o
Collocated
Module
C
o
66” 12-pin Extended Control Cable for attaching Collocated Module C to Controller and
Mass Flow Controller
o
T-plug (Installed in Inlet Tee)
o
Leak Check (Flow Audit) Assembly: Downtube Reducer (1.5”ID to 1.25”OD), Leak Check
(Flow Audit) Adapter (1.25” to brass hose barb with shutoff valve), 1 pump shutoff valve
assembly, audit cassette cartridge tray.
o
Inlet
Cap