6.- EQUIPMENT MAINTENANCE
- 78 -
6.4.- Replacing fuse
ATTENTION: Before changing the fuse, ALWAYS unplug the
power cable. Always use fuses of the value and type specified
(see
chapter 9: Specifications)
.
In order to avoid possible supply voltage peaks that might damage the UM2B, the
unit incorporates a fuse, housed in the lower part of the mains connector (5). The fuse-
holder may be slid out by hand or using a small screwdriver. Inside (inner) is the operating
fuse and, in an adjacent compartment (outer), a spare.
The very arrangement of the fuse-holder makes it necessary to disconnect
the power cable. Nevertheless, great care should be taken to ensure
safety, and the cables should be disconnected from the equipment being
tested. Also, the UM2B should be moved away from this equipment.
After having carried out the aforementioned safety processes, replace the fuse as
follows:
1
Turn off the switch on the rear panel
2
Disconnect the cables from the equipment being tested.
3
Disconnect the power cable.
4
Open the fuse-holder.
5
Remove the blown fuse (the inner one).
6
Insert the adequate spare fuse.
7
Close the fuse-holder.
Содержание UM2B
Страница 2: ......
Страница 49: ...5 SOFTWARE DESCRIPTION 47 Figure 5 18 Warning message Figure 5 19 a Measurement Screen Recovery Voltage ...
Страница 67: ...5 SOFTWARE DESCRIPTION 65 Figure 5 46 a First page of the report Recovery Voltage ...
Страница 68: ...5 SOFTWARE DESCRIPTION 66 Figure 5 47 a Second page of report Recovery Voltage ...
Страница 69: ...5 SOFTWARE DESCRIPTION 67 Figure 5 48 Third page of report Recovery Voltage ...
Страница 70: ...5 SOFTWARE DESCRIPTION 68 Figure 5 46 b First page of the report Insulation Resistance ...
Страница 71: ...5 SOFTWARE DESCRIPTION 69 Figure 5 47 b Second page of the report Insulation Resistance ...
Страница 87: ...8 TECHNICAL SUPPORT 85 Description of fault Materials returned on of of the year Table 8 1 ...
Страница 95: ...APPENDIX B CONTROL SOFTWARE 93 APPENDIX A CE CONFORMITY DECLARATION ...