5.- SOFTWARE DESCRIPTION
- 29 -
5.2.- Hardware dongle. Configuration menu
The first step to carry out before executing the application, is to place the security
key (dongle) supplied in the parallel port of the PC (LPT1). In the case of not connecting it,
the software will only allow you to carry out analysis of test already performed. When you
connect it, you will be able to carry out a test.
For system configuration, click on
"Config"
button. Successively, the following
menu will appear (Figure 5-3), in which one will choose the parameters of the system:
Figure 5-3: Configuration Screen.
-
Control
:
the communication with the unit is performed by means of the serial port
(RS-232). You will need to indicate which port will be used, (COM1- COM4), by means of
the existent ring.
-
Supply:
First of all you will need to select the mains voltage, that will be 115 or
230 V. The frequency of mains voltage will also need to be selected, which will be 50 or
60 Hz, by means of the corresponding ring. The manipulation of this record is just
informative, the user will have to check the proper supply of the unit from it‟s name plate.
-
Language:
Select one of the languages that are listed. Once selected, after finishing
the program configuration, all the text of the application will change to the selected
language.
Содержание UM2B
Страница 2: ......
Страница 49: ...5 SOFTWARE DESCRIPTION 47 Figure 5 18 Warning message Figure 5 19 a Measurement Screen Recovery Voltage ...
Страница 67: ...5 SOFTWARE DESCRIPTION 65 Figure 5 46 a First page of the report Recovery Voltage ...
Страница 68: ...5 SOFTWARE DESCRIPTION 66 Figure 5 47 a Second page of report Recovery Voltage ...
Страница 69: ...5 SOFTWARE DESCRIPTION 67 Figure 5 48 Third page of report Recovery Voltage ...
Страница 70: ...5 SOFTWARE DESCRIPTION 68 Figure 5 46 b First page of the report Insulation Resistance ...
Страница 71: ...5 SOFTWARE DESCRIPTION 69 Figure 5 47 b Second page of the report Insulation Resistance ...
Страница 87: ...8 TECHNICAL SUPPORT 85 Description of fault Materials returned on of of the year Table 8 1 ...
Страница 95: ...APPENDIX B CONTROL SOFTWARE 93 APPENDIX A CE CONFORMITY DECLARATION ...