4.- PREPARATIONS BEFORE TO USE
- 26 -
4.3.- Disconnection of equipment
ATTENTION!: The cabling should be handled with great care, since
high voltage direct current is involved. There are moments during
the test in which the equipment might be electrically charged at high
voltage, and handling of the cabling or equipment after the test might
be dangerous. Consequently, the habitual safety measures applied to
high voltage installations should be taken into account.
Following performance of the test, the equipment itself will discharge the machine
analyzed. Meanwhile, the computer will show a message indicating that this operation is
being carried out. Consequently,
the UM2B unit should be turned off when so indicated
by the control software, following the measurements.
In some transformers, discharging may take several minutes.
Consequently, it is good safety practice to use rubber gloves when
handling the connecting clips.
When requested by the program
, the UM2B unit should be disconnected in
accordance with the following steps:
- Switch off the UM2B unit.
- Remove the clips from the equipment being tested.
- Remove the cables from the UM2B. If high voltage connectors are
blocked, unblock them threading security screw that allows remove them.
Содержание UM2B
Страница 2: ......
Страница 49: ...5 SOFTWARE DESCRIPTION 47 Figure 5 18 Warning message Figure 5 19 a Measurement Screen Recovery Voltage ...
Страница 67: ...5 SOFTWARE DESCRIPTION 65 Figure 5 46 a First page of the report Recovery Voltage ...
Страница 68: ...5 SOFTWARE DESCRIPTION 66 Figure 5 47 a Second page of report Recovery Voltage ...
Страница 69: ...5 SOFTWARE DESCRIPTION 67 Figure 5 48 Third page of report Recovery Voltage ...
Страница 70: ...5 SOFTWARE DESCRIPTION 68 Figure 5 46 b First page of the report Insulation Resistance ...
Страница 71: ...5 SOFTWARE DESCRIPTION 69 Figure 5 47 b Second page of the report Insulation Resistance ...
Страница 87: ...8 TECHNICAL SUPPORT 85 Description of fault Materials returned on of of the year Table 8 1 ...
Страница 95: ...APPENDIX B CONTROL SOFTWARE 93 APPENDIX A CE CONFORMITY DECLARATION ...