Safety Precautions
CAUTION
●
Be sure to disconnect the power cable when performing the following.
- Attachment/detachment of connectors of options.
- Wiring/connection of cables to terminal blocks.
- Connection of the ground line.
●
Take an interval of more than 5 seconds when repeating ON/OFF.
●
For connection to the signal I/O terminal block, wire correctly after checking the signal
names and terminal block numbers.
Also, turn off the power of the main body before connection/wiring to the signal I/O
terminal block.
●
Use shielded cables for the connection of strain gauge type sensor, displacement
sensor, External input and output or options.
●
Take adequate shielding measures when using at the following locations.
- Near a power line.
- Where a strong electric field or magnetic field is formed.
- Where static electricity, relay noise or the like is generated.
●
Do not install in the following environments.
- Where the temperature and/or humidity exceeds the range in the specifications.
- Places with large quantities of salt or iron powder.
- Where the main body is directly affected by vibration or shock.
●
Do not use it, broken down.
●
When you send F395 by repair etc., please take sufficient measures against a shock.
Содержание f395
Страница 1: ...Operation Manual F395 DYNAMIC FORCE PROCESSOR 10 Apr 2012 Rev 1 12...
Страница 167: ...21 Outer Dimensions 153 21 Outer Dimensions Unit mm 3 3 5 5 Rear Front Side Panel cut dimensions...
Страница 180: ...Unipulse Corporation 9 11 Nihonbashi Hisamatsucho Chuo ku Tokyo 103 0005 Tel 81 3 3639 6120 Fax 81 3 3639 6130...