background image

 

 

  3. Specifications

 

 

  Max. Pressure 

 

  1.3 x 10

-4 

Pa 

  (Using liquid nitrogen, with no load in the vacuum tank)

 

 

  Evacuation time 

 

  Less than 10 min. to 10

-4 

Pa 

(Using liquid nitrogen, with no load in the vacuum tank)

 

 

  Power consumption 

 

  100 V single phase 1.0 kVA   

 

  200 V three-phase 5.0 kVA

   

 

  Water consumption 

Water temp./pressure 

 

  1.5 L/min.   

 

  20 °C / 200-300 kPa (gauge pressure)

 

 

  Dimensions 

  Weight 

 

  W 1235 mm x D 836 mm x H 2155 mm 

 

  About 313 kg

 

 

  Coating 

 

  JIS S-5-462 printing (Munsell 5GY8/0.5)

 

Listed above are the standard specifications. 
Please refer to the VPC-1100 (Special) specifications for details of special configurations. 

 

  4. Individual equipment specifications

 

Equipment Name 

Type / Specifications 

Number 

 

  1) Glass bell jar

 

 

Dimensions   Inner diameter Ø 390 mm x H 350 mm   

 

Material 

Pyrex

 

 

  1

 

 

2) Evaporation power 

supply

 

Model: PSE-150C 

 

Dimensions: W480 mm × D435.3 mm × H149 mm 

 

Input: Single phase 200 V 

 

Output: 150 A max. 

 

Rating: 30 minutes 

 

Control method

 

  Thyristor AC phase control method

 

 

Output control

 

 

 

Constant power operation 
Constant current operation 
Constant voltage operation   
(Setting when shipped out: constant current) 

 

-

 

Load output

   

  3-Position 

 

 

 

 

Appurtenant devices:   

Output cable (38 mm2 × 2 m)

 

 

  1

 

Содержание VPC-1100

Страница 1: ...ease read this manual thoroughly to ensure safe and effective operation of this equipment Keep this manual in a safe place Please note that due to performance upgrade the equipment described in this m...

Страница 2: ...ent specifications 3 5 Standard accessories 5 6 How to use the switches handle and operation lever 6 7 Layout of the switches handle and operation lever 7 Flow chart 8 Wiring diagram 8 3 Unpacking and...

Страница 3: ...repairs 20 1 Dangers and safety guidelines during maintenance and repairs20 2 Maintenance and repairs by the customer 21 3 Removing maintaining and installing equipment 21 3 1 Oil sealed rotary vacuum...

Страница 4: ...t permission of Ulvac Kiko Inc Read this section before using the VPC 1100 Follow the instructions below to safely use the device and prevent personal injuries from occurring Please comply with them a...

Страница 5: ...o the nearest terminal If the unit is not properly grounded you may get an electrical shock due to a malfunction or short circuit Check cable capacity If possible do not use an extension cord If using...

Страница 6: ...operation and for 30 minutes after being switched off the oil diffusion pump and oil sealed rotary vacuum pump are extremely hot Do not touch directly with your hands May cause burns Use an oil mist t...

Страница 7: ...perly or may affect its durability Do not attempt alone This device should be moved by two or more people May cause back pains or other injuries Do not attempt alone Attaching or removing the hoist sh...

Страница 8: ...ber gloves or other protection over exposed areas of skin A droplet coming into contact with your skin can be extremely painful Venting After stopping the oil sealed rotary vacuum pump open the RP ven...

Страница 9: ...ed exhaust resistance can build up and cause oil leakage from the shaft seal or damage to the oil level gauge Follow all regulations Waste oil used in the pump must be disposed of in accordance with a...

Страница 10: ...caused by modifications or repairs carried out by a party other than the manufacturer or by a service company not approved by the manufacturer e Malfunctions caused by noise electric disturbance f Ma...

Страница 11: ...upply cut off Prevents the oil diffusion pump from overheating Pressure switch detects cutoff Oil diffusion pump heater interlock Alarm warns if water supply cut off Auto reset when supply restored Si...

Страница 12: ...re the standard specifications Please refer to the VPC 1100 Special specifications for details of special configurations 4 Individual equipment specifications Equipment Name Type Specifications Number...

Страница 13: ...irani vacuum gauge Power consumption 0 55 kW Oil SMR 100 1 1 L 2 5 Main valve Type SBVM 6AX Butterfly valve 1 6 Liquid nitrogen trap Bore diameter 150 A Injection amount Approx 3 5 L Including vapor 1...

Страница 14: ...cifications manual for details 5 Standard accessories 1 Power cable 200 V three phase crimp style terminal 4m 100 V single phase with plug 4m 1 1 2 Hermetic seal port Sealing plate Socket 3 3 3 Gauge...

Страница 15: ...n Move counter clockwise Close Move clockwise Fully open Rotate the handle counter clockwise until it grows heavy then turn back a quarter turn Fully close Rotate the handle clockwise until it grows h...

Страница 16: ...7 Layout of the switches handle and operation lever...

Страница 17: ...Flow chart Wiring diagram GLD 202A...

Страница 18: ...in body of the device including casters hoist assembled and box of accessories will be delivered The hoist will be attached on site 3 Installation Warning Check environment This device should be insta...

Страница 19: ...leads are green cables 100 V plugs use a grounded plug If you are using a plug adapter connect the ground lead to the nearest terminal If the device is not properly grounded you may get an electrical...

Страница 20: ...x Outer diameter 15 mm Caution Secure pipe The coolant pipe should be fixed in place with a hose band Prevents accidents caused by cooling water leakage Note The Japan Refrigeration and Air Condition...

Страница 21: ...and insert it into the hoist mounting plate 3 Secure hoist Move the hoist s upper arm so it faces the glass bell jar Secure the hoist using the flat washers spring washers and hexagonal bolts in that...

Страница 22: ...in place 7 Removal Perform steps 5 to 2 in reverse order 8 Attaching the liquid nitrogen intake pipe Attachment 1 Preparation Remove the liquid nitrogen intake pipe and funnel cap bracket from the bo...

Страница 23: ...y valve lever is set to CLOSE Make sure the RP VENT is fully open 2 Check Switch on RP1 The rear pump will start up If the pump is rotating in the opposite direction you will soon hear a rattling soun...

Страница 24: ...ves When handling liquid nitrogen wear rubber gloves or other protection over exposed areas of skin A droplet coming into contact with your skin can be extremely painful Venting After stopping the oil...

Страница 25: ...rt 3 2 Operation Exhaust system warm up 1 Your breaker ON Receiving light on main breaker Should light up 2 Main breaker ON 3 Cooling water ON 4 RP1 RP2 ON 5 Three way valve FORE 6 Pirani vacuum gauge...

Страница 26: ...F Steps 8 and 9 should be performed when possible Usually the procedure is complete at the end of step 6 4 Using the evaporator 4 1 Opening the bell jar 1 If using an ionization vacuum gauge filament...

Страница 27: ...Confirmation 5 Turn on the evaporator power switch 6 The current is gradually thrown to the evaporation source pushing the UP key 7 Once the evaporation element is red hot and the vapor source has sta...

Страница 28: ...on 6 4 Water supply temporarily cut off All machinery will automatically return to its state prior to the cutoff 6 5 Water supply cut off for a prolonged period Stop the device 1 If using an ionizatio...

Страница 29: ...o fall Follow all regulations Waste oil used in the pump must be disposed of in accordance with all relevant laws and regulations Please handle waste oil in accordance with the laws and regulations If...

Страница 30: ...towards you disconnect the motor wiring connectors 3 places by pulling them to the left or right Disconnect the ground lead from the mounting frame Remove the vibration proof rubber nuts 4 places Get...

Страница 31: ...racket Remove the oil diffusion pump by pulling it towards you 3 Replace oil See the separate ULK 06A oil diffusion pump user manual 4 Attachment Place the oil diffusion pump underneath the liquid nit...

Страница 32: ...ase As thinly as possible so that a film forms Clean the inside of the O ring groove Fit the O ring inside the groove 3 5 Glass bell jar 1 Necessary equipment dust mask gloves 2 Removal Loosen the dro...

Страница 33: ...ssary Oil sealed rotary vacuum pump Replace the oil RP VENT closed Three way valve set to CLOSE start RP 1 and RP 2 at the same time If the Pirani vacuum gauge pressure is 5 Pa or higher replace the o...

Страница 34: ...uation time Oil sealed rotary vacuum pump is defective Refer to the oil sealed rotary vacuum pump user manual Max pressure low or Max pressure unsteady or Evacuation power reduced Measurement device i...

Страница 35: ...eing used accidentally Precautions when using only one pump 1 Do not operate the device while the vacuum hose of the malfunctioning oil sealed rotary vacuum pump is connected Oil or air may back up an...

Страница 36: ...ng for suction flange V 175 NBR 1 OK O ring for leakage valve N 6 NBR 1 OK Upper portion conversion flange O ring for leakage valve N 8 NBR 1 OK O ring for suction flange V 175 Attached component FPM...

Страница 37: ...10A 4 Bell jar cover Rubber lip KV 1297 01 143 EPDM 0 31m OK The numbers listed above are for the standard specification If optional parts are attached these numbers will differ 6 Disposal 1 Precautio...

Страница 38: ...events contamination On site Non stick board Prevents evaporation from sticking to the glass bell jar On site UFC070 adapter To fit an 070 Conflat flange On site Measurement rack Built in ionization v...

Страница 39: ...coil For heating the inside of the bell jar Factory Film formation controller For measurement and control of film thickness and film formation speed On site Film thickness sensor Sensor for film cont...

Отзывы: