A01118
Starter Relay
P07170
1
Continuity
No
3
2
5
Continuity
Ohmmeter
1
P07171
1
Continuity
3
2
5
Battery
Ohmmeter
ST03Y--01
--
STARTING
STARTER RELAY
ST--15
STARTER RELAY
INSPECTION
1 . RE MO V E S TARTE R RE LAY (Ma r k i ng:”S T”)
2. INSPECTION RELAY CONTINUITY
(a)
Using an ohmmeter, check that there is continuity be-
tween terminals 1 and 2.
If there is no continuity, replace the relay.
(b)
Check that there is no continuity between terminals 3 and
5.
If there is continuity, replace the relay.
3. INSPECT RELAY OPERATION
(a)
Apply battery voltage across terminals 1 and 2.
(b)
Using an ohmmeter, check that there is continuity be-
tween terminals 3 and 5.
If operation is not as specified, replace the relay.
4 . RE I NS TALL S TARTE R RE LAY
CLICK HERE TO VIEW CHAPTER INDEX
Pages From Supplement
3RZ-F,3RZ-FE