13
Monobloc Outdoor Unit Installation Manual
7.1 Moving and Positioning the Unit
7.1.1 Moving the Unit:
Do not remove the pallet or the packaging until the unit is in its final position. These units can be moved with a
fork lift truck, as long as the forks are positioned in the right place and direction on the unit.
The units can also be lifted with slings (refer to Figure 2 and 3). Use slings with the correct capacity, and
always follow the lifting instructions on the certified drawings supplied for the unit.
Before lifting the unit, check that all casing panels are securely fixed in place. Lift and set down the unit with
great care. Tilting and jarring can damage the unit and impair unit operation.
Safety is only guaranteed, if these instructions are carefully followed. If this is not the case, there is a risk of
material deterioration and injuries to personnel.
•
If the Monobloc outdoor units are hoisted with rigging, it is advisable to protect coils against crushing while a
unit is being moved. Use struts or a lifting beam to spread the slings above the unit. Do not tilt a unit more than
15°.
•
Never push or lever on any of the enclosure panels of the unit. Only the base of the unit frame is designed to
withstand such stresses. If a unit includes a hydronic module, the hydronic module and pump piping must be
installed in a way that does not submit it to any strain. The hydronic module pipes must be fitted so that the
pump does not support the weight of the pipes.
Figure 1: Transportation configuration
Figure 2: Offloading configuration
Figure 3: Installation configuration
Содержание Estia RUA-CP1701H
Страница 93: ......
Страница 94: ...TOSHIBA CARRIER EUROPE S A S Route de Thil 01120 Montluel France 1402410101 ...