Dionex Easion Operator’s Manual
84
Doc. 155028-01 08/20
3. The fuse drawer is located above the
tab locks the fuse drawer in place. Using
a small screwdriver, press the tab
in
and
then up
to release the fuse drawer.
4. Pull the fuse drawer out of the rear panel
and remove the old fuses.
5. Replace the two fuses with new fast-blow
IEC 127 fuses rated 3.15 A
(P/N 954745). Thermo Fisher Scientific
recommends always replacing
both
fuses.
Figure 5-11. Fuse Drawer
6. Insert the fuse drawer into the rear panel and press until the drawer snaps into
place.
7. Reconnect the main power cord and turn on the power.
Fuse
Drawer
Tab
Содержание Dionex Easion
Страница 1: ...Dionex Easion Ion Chromatography System Operator s Manual Document No 155028 Revision 01 August 2020 ...
Страница 34: ...Dionex Easion Operator s Manual 26 Doc 155028 01 08 20 ...
Страница 68: ...Dionex Easion Operator s Manual 60 Doc 155028 01 08 20 ...
Страница 76: ...Dionex Easion Operator s Manual 68 Doc 155028 01 08 20 Figure 5 2 Dionex Easion Flow Schematic ...
Страница 110: ...Dionex Easion Operator s Manual 102 Doc 155028 01 08 20 ...
Страница 118: ...Dionex Easion Operator s Manual 110 Doc 155028 01 08 20 ...