5 • Service
Doc. 155028-01 08/20
71
To install the new check valves:
1. Inspect the new inlet check valve
assembly (P/N 045722) to verify that the
double-hole end of the cartridge is
visible (see
If the double-hole end is not visible,
remove the cartridge from the housing
and install it correctly.
2.
Inspect the new outlet check valve
assembly (P/N 045721) to verify that the
single-hole end of the cartridge is visible.
If the single-hole end is not visible,
remove the cartridge from the housing
and install it correctly.
Figure 5-5. Check Valve Assemblies
NOTE The pump will not operate properly unless the cartridge
is installed in the housing in the correct orientation.
Liquid flows through the check valve in the large single
hole and out the small double holes.
Figure 5-4. Pump Heads
Secondary
Pump Head
Primary
Pump Head
Outlet Check
Valve
Inlet Check
Valve
Double-hole
Single-hole
Flow
Flow
Inlet Check Valve
Outlet Check Valve
1/4-28 Port
10-32 Port
Содержание Dionex Easion
Страница 1: ...Dionex Easion Ion Chromatography System Operator s Manual Document No 155028 Revision 01 August 2020 ...
Страница 34: ...Dionex Easion Operator s Manual 26 Doc 155028 01 08 20 ...
Страница 68: ...Dionex Easion Operator s Manual 60 Doc 155028 01 08 20 ...
Страница 76: ...Dionex Easion Operator s Manual 68 Doc 155028 01 08 20 Figure 5 2 Dionex Easion Flow Schematic ...
Страница 110: ...Dionex Easion Operator s Manual 102 Doc 155028 01 08 20 ...
Страница 118: ...Dionex Easion Operator s Manual 110 Doc 155028 01 08 20 ...