Dionex Easion Operator’s Manual
64
Doc. 155028-01 08/20
NOTE To open the waste valve on the front of the
secondary pump head (see
), turn the
knob one-half turn counterclockwise.
6. Close the waste valve.
7. Under
Pressure Transducer
, click
Calibrate Slope
. A panel with
instructions and command buttons appears.
8. Follow the instructions on the panel to complete the transducer slope
calibration procedure. The new slope will be determined and then
stored as the current value.
9. Turn off the pump.
10. Disconnect the pressure gauge and backpressure tubing.
11. Reconnect the pressure transducer to the pump.
Figure 5-1. Dionex Easion Interior Components
Waste Valve
Pressure
Transducer
Содержание Dionex Easion
Страница 1: ...Dionex Easion Ion Chromatography System Operator s Manual Document No 155028 Revision 01 August 2020 ...
Страница 34: ...Dionex Easion Operator s Manual 26 Doc 155028 01 08 20 ...
Страница 68: ...Dionex Easion Operator s Manual 60 Doc 155028 01 08 20 ...
Страница 76: ...Dionex Easion Operator s Manual 68 Doc 155028 01 08 20 Figure 5 2 Dionex Easion Flow Schematic ...
Страница 110: ...Dionex Easion Operator s Manual 102 Doc 155028 01 08 20 ...
Страница 118: ...Dionex Easion Operator s Manual 110 Doc 155028 01 08 20 ...