Installation Process
13.
Close (turn clockwise) the leakage compensation valve until the
gauge reads about 2.7 inches of water
.
Close the valve until the purging indicator no longer cycles on and
off. The relief valve will be closed and the enclosure will just
maintain operating pressure. Setting an appropriate operating
pressure saves purge gas.
14.
Turn off the purge supply and then remove the test point gauge and
reinstall the red plug.
15.
Turn on the purge gas supply until the pressure delivered to the
enclosure inlet is between 4 barg and 8 barg, 60 psi and 115 psi, or
400 kPA and 800 kPA.
Thermo Fisher Scientific
Antaris EX Safety, Installation, and Site Preparation Guide
67
Содержание Antaris EX
Страница 1: ...Antaris EX Safety Installation and Site Preparation Guide ...
Страница 6: ...This page intentionally left blank ...
Страница 10: ...This page intentionally left blank ...
Страница 29: ...Safety Considerations Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 23 ...
Страница 30: ...Safety Considerations OR 24 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 32: ...Safety Considerations 26 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 35: ...Safety Considerations s Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 29 ...
Страница 36: ...Safety Considerations s 30 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 92: ...This page intentionally left blank ...
Страница 108: ...269 188702 Rev A ...