Installation Process
See the label on the enclosure for appropriate pressures and flow rates.
Both the pressure and flow rate must be correct to start the purge
timer.
3.
After the purge cycle completes, power will be applied
automatically by the purge timer.
Antaris EX-Z2
In general, the power on procedure for Zone 2 installations includes these
steps:
1.
Turn on the purge gas supply until the purge gas being delivered to
the inlet is at a pressure between 4 barg and 8 barg, 60 psi and
115 psi, or 400 kPA and 800 kPA.
2.
Move the lever to the Purge On position.
3.
Wait until the purge indicator indicates appropriate pressure and
flow has been reached.
4.
Check the labeling on the enclosure, and wait the specified purge
stabilization time.
Thermo Fisher Scientific
Antaris EX Safety, Installation, and Site Preparation Guide
69
Содержание Antaris EX
Страница 1: ...Antaris EX Safety Installation and Site Preparation Guide ...
Страница 6: ...This page intentionally left blank ...
Страница 10: ...This page intentionally left blank ...
Страница 29: ...Safety Considerations Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 23 ...
Страница 30: ...Safety Considerations OR 24 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 32: ...Safety Considerations 26 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 35: ...Safety Considerations s Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 29 ...
Страница 36: ...Safety Considerations s 30 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 92: ...This page intentionally left blank ...
Страница 108: ...269 188702 Rev A ...