Installation Process
If the alarm/pressurized indicator flashes briefly to red when the purge lever
is turned off,
the leakage compensation valve is closed too far. Continue
to step 3 to adjust the valve.
If no air is flowing and the compartment remains pressurized,
no
adjustment is needed. The analyzer is commissioned.
If the relief valve opens occasionally and the compartment remains
pressurized,
no adjustment is needed. The analyzer is commissioned.
3.
Use a flat-blade screwdriver to adjust the leakage control valve.
Turn the control clockwise to close the valve.
Turn the control counterclockwise to open the valve.
When properly adjusted, the relief valve should remain closed and the
compartment should remain pressurized. The relief valve occasionally
opening is not a cause for concern.
If the valve cannot be properly adjusted, follow the procedure
“Recalibrating an Antaris EX-Z2” later in this manual.
52
Antaris EX Safety, Installation, and Site Preparation Guide
Thermo Fisher Scientific
Содержание Antaris EX
Страница 1: ...Antaris EX Safety Installation and Site Preparation Guide ...
Страница 6: ...This page intentionally left blank ...
Страница 10: ...This page intentionally left blank ...
Страница 29: ...Safety Considerations Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 23 ...
Страница 30: ...Safety Considerations OR 24 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 32: ...Safety Considerations 26 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 35: ...Safety Considerations s Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 29 ...
Страница 36: ...Safety Considerations s 30 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 92: ...This page intentionally left blank ...
Страница 108: ...269 188702 Rev A ...