Installation Process
Check the label on the front of the analyzer if you are unsure of the
correct normal operating pressure.
2.
Check the alarm/pressurized and purging indicators.
As the pressure builds, the alarm/pressurized indicator should change
from red to green. The purging indicator should change from black to
yellow whenever purge gas flows into the system.
Purging (Yellow)
Alarm/pressurized (Green)
3.
Turn off the purge supply at its source and wait for the
Alarm/Pressurized indicator to turn red and the Purging indicator
to turn black.
4.
Repeat steps 1 through 3 several times to confirm indicator
operation.
Thermo Fisher Scientific
Antaris EX Safety, Installation, and Site Preparation Guide
45
Содержание Antaris EX
Страница 1: ...Antaris EX Safety Installation and Site Preparation Guide ...
Страница 6: ...This page intentionally left blank ...
Страница 10: ...This page intentionally left blank ...
Страница 29: ...Safety Considerations Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 23 ...
Страница 30: ...Safety Considerations OR 24 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 32: ...Safety Considerations 26 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 35: ...Safety Considerations s Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 29 ...
Страница 36: ...Safety Considerations s 30 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 92: ...This page intentionally left blank ...
Страница 108: ...269 188702 Rev A ...