Installation Process
Antaris EX-Z1
and Antaris EX-Z2
In general, the power off procedure for Zone 1 and Zone 2 installations
includes these steps:
1.
Remove the power from the branch circuit servicing the
instrument.
2.
Turn off the purge gas flow.
3.
If you must open the enclosure, wait at least the prescribed time to
allow internal parts to cool below the flash point of the
surrounding atmosphere.
Antaris EX-IP
In general, the power off procedure for EX-IP installations includes these
steps:
1.
Remove the power from the branch circuit servicing the
instrument.
2.
Disconnect the power cord from the outlet.
Thermo Fisher Scientific
Antaris EX Safety, Installation, and Site Preparation Guide
71
Содержание Antaris EX
Страница 1: ...Antaris EX Safety Installation and Site Preparation Guide ...
Страница 6: ...This page intentionally left blank ...
Страница 10: ...This page intentionally left blank ...
Страница 29: ...Safety Considerations Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 23 ...
Страница 30: ...Safety Considerations OR 24 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 32: ...Safety Considerations 26 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 35: ...Safety Considerations s Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 29 ...
Страница 36: ...Safety Considerations s 30 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 92: ...This page intentionally left blank ...
Страница 108: ...269 188702 Rev A ...