Installation Process
4.
If the indicators are the correct color, continue on to step 5.
If the indicators are not the correct color, recheck the input pressure
and flow to be sure the pressure is in the appropriate range.
If the inlet pressure and flow is correct, but the indicator colors are not
correct, contact technical support.
5.
Turn off the purge supply, wait for the Alarm/Pressurized indicator
to turn red and the Purging indicator to turn black.
6.
Turn on the purge supply, watch the indicators and begin timing
when the Purging indicator turns yellow.
7.
Continue timing until power is applied to the instrument.
If the time is at or in excess of the minimum purge time listed on the
purge specifications label (a tolerance of +20% is acceptable), continue
on to calibrate the leakage compensation valve.
If the time is less than the minimum purge time, contact technical
support.
60
Antaris EX Safety, Installation, and Site Preparation Guide
Thermo Fisher Scientific
Содержание Antaris EX
Страница 1: ...Antaris EX Safety Installation and Site Preparation Guide ...
Страница 6: ...This page intentionally left blank ...
Страница 10: ...This page intentionally left blank ...
Страница 29: ...Safety Considerations Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 23 ...
Страница 30: ...Safety Considerations OR 24 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 32: ...Safety Considerations 26 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 35: ...Safety Considerations s Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 29 ...
Страница 36: ...Safety Considerations s 30 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 92: ...This page intentionally left blank ...
Страница 108: ...269 188702 Rev A ...