Installation Process
Check the label on the front of the analyzer if you are unsure of the
correct normal operating pressure.
2.
Check the alarm/pressurized and purging indicators.
Move the purge valve control lever to the Purge ON position. As the
pressure builds, the alarm/pressurized indicator should change from red
to green. The purging indicator should change from black to yellow.
Leakage
compensation valve
Purge off
Purge on
Lever
3.
Turn off the purge supply, wait for the Alarm/Pressurized indicator
to turn red and the Purging indicator to turn black.
4.
Repeat steps 1 through 3 several times to confirm indicator
operation.
50
Antaris EX Safety, Installation, and Site Preparation Guide
Thermo Fisher Scientific
Содержание Antaris EX
Страница 1: ...Antaris EX Safety Installation and Site Preparation Guide ...
Страница 6: ...This page intentionally left blank ...
Страница 10: ...This page intentionally left blank ...
Страница 29: ...Safety Considerations Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 23 ...
Страница 30: ...Safety Considerations OR 24 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 32: ...Safety Considerations 26 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 35: ...Safety Considerations s Thermo Fisher Scientific Antaris EX Safety Installation and Site Preparation Guide 29 ...
Страница 36: ...Safety Considerations s 30 Antaris EX Safety Installation and Site Preparation Guide Thermo Fisher Scientific ...
Страница 92: ...This page intentionally left blank ...
Страница 108: ...269 188702 Rev A ...