
NBC™ Flat Belt - IOM
P/N: 1118140
Rev: 07/29/2020
Page
23
of
129
NBC
R
ECEIVING AND
S
ITE
P
REPARATION
Receiving
TGW Systems NBC flat belt conveyors are shipped in subassemblies. These subassemblies are
packaged to guard against damage in shipment when handled properly.
Examination immediately following unloading will show if any damage was caused during shipment. If
damage is evident, claims for recovery of expenses to repair damaged or replace components must
be made against the carrier immediately. While unloading, a check must be made against the Bill of
Lading, or other packing lists provided, to confirm full receipt of listed items.
TAKE CARE DURING THE REMOVAL OF EQUIPMENT FROM THE CARRIER.
Remove small
items and boxes first. Pull and lift only on the skid, not on the frame, crossmember or any part of the
equipment.
Be sure the skid is free of other materials which may be on top of or against the side of the skid to
be removed.
Conveyor ready for shipment
Preparation of Site
After the conveyor is received, move it to the installation site or designated dry storage area as soon
as possible. Clean up all packing material immediately before parts are lost in it, or accidentally
discarded. Loose parts should remain in the shipping boxes until needed. Prior to starting the
assembly of the conveyor, carefully check the installation path to be sure there are no obstructions
that will cause interference. Check for access along the path needed to bring in bed sections and
components closest to the point where they are needed. It is often necessary to give the area along
the system path a general cleanup to improve installation efficiency, access, and accuracy.
CAUTION