Revolution Series PT-3500 / PT-7500 Puller Tensioner Page 114
Maintenance
Preventive Maintenance Schedule
(Page 3)
Every 100 Hours of Use or 6 months/6,000miles
(whichever comes first)
All
Replace Hydraulic Fluid
Filters
Replace all three hydraulic fluid filters every 100 hours, or
sooner if indicated by the system-
(s
and Filters section).
All
Inspect Trailer Braking
Components
Brake Magnets and Brake Controller
-
(see Brake section).
All
Inspect Trailer
Suspension
Inspect for bending, loose fasteners, and wear
.
All
Inspect Wheels
Inspect wheels for damage,
(i.e. cracks, dents, or distortions)
.
All
Grease Spider System
Fairlead Locking Pin
Use Lithium Grade 2 All-Purpose Grease-
(see Spider System
Assembly section).
All
Check Torque On Spider
System Mount Screws
(See Spider System Assembly section.)
PT-3500
Grease Pillow Block
Bearing
Use Lithium Grade 2 All-Purpose Grease-
(see Drum/Reel Drive
Assembly section).
PT-3500
Clean Engine Air Filter
Element
Clean filter element every 100 hours, and only use less than 30
psi compressed air.
PT-3500
Drain the Fuel Water
Separator
(If Applicable)
Drain the fuel water separator to purge any
accumulated water from the diesel fuel lines.
PT-3500
Clean Engine Fuel Filter
(See Engine Manual.)
PT-3500
Check Engine Fan Belt
Check engine fan belt for proper tightness
- (s
ee Engine Manual).
NOTE:
Filters can be changed sooner dependent upon
conditions and if indicated by the system. The system is
designed to monitor fluid and filter life/flow.
WARNING:
System must be tagged/locked out prior to removing any machine guarding, removing any system
component, or performing any maintenance outside of basic visual inspections.
NOTE:
All preventive maintenance steps detailed in this sections are in addition to the required pre/post-
operation inspection steps.
NOTE:
All Preventive Maintenance should be conducted in accordance with OSHA requirements, to include OSHA
Standard- 29 CFR, Part 1910.147.
Содержание PT-3500
Страница 1: ...PT 3500 PT 7500 Puller Tensioner Operators Manual...
Страница 2: ......
Страница 6: ......
Страница 9: ......
Страница 22: ...Revolution Series PT 3500 PT 7500 Puller Tensioner Page 20 Operation Operator Controls 2 ReGen Icon PT 3500...
Страница 81: ......
Страница 82: ...S R Revolution Series PT 3500 PT 7500 Puller Tensioner Page 78 Troubleshooting Fuse Relay Wiring Schematic...
Страница 83: ...S R Revolution Series PT 3500 PT 7500 Puller Tensioner Page 79 Troubleshooting...
Страница 84: ...S R Revolution Series PT 3500 PT 7500 Puller Tensioner Page 80 Fuse Relay Wiring Schematic...
Страница 85: ...S R Revolution Series PT 3500 PT 7500 Puller Tensioner Page 80 Troubleshooting PT Trailer Wiring Schematic...
Страница 86: ...S R Revolution Series PT 3500 PT 7500 Puller Tensioner Page 80 Troubleshooting PT Trailer Wiring Schematic...
Страница 87: ...S R Revolution Series PT 3500 PT 7500 Puller Tensioner Page 81 Troubleshooting Hydraulic Schematic 7500...
Страница 88: ...S R Revolution Series PT 3500 PT 7500 Puller Tensioner Page 81 Troubleshooting PT Hydraulic Schematic...
Страница 89: ......
Страница 129: ...Revolution Series PT 3500 PT 7500 Puller Tensioner Page 121...
Страница 131: ...Revolution Series PT 3500 PT 7500 Puller Tensioner Page 123...
Страница 133: ...Revolution Series PT 3500 PT 7500 Puller Tensioner Page 125...
Страница 134: ...Revolution Series PT 3500 PT 7500 Puller Tensioner Page 126 A...