Temperature Control Units : Veteran with LXG Series Instrument
Page: 32
TEMPTEK, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-6352 Fax: 317-881-1277
Email: [email protected]
C.
Hi Deviation.
The High Deviation value programs the controller to sound the alarm if the
process temperature exceeds the set difference from setpoint. For example, Hi Deviation
= 5°F, Setpoint = 200°F. Hi deviation alarm will sound if the temperature reaches 205°F.
1.
The factory default is 10°. The range for the Hi Deviation is from 0°F - 50°F.
2.
Once acknowledged, press the Back button repeatedly to return to the Setpoints
screen or press the home button to return to the Home screen.
D.
Lo Deviation.
The Lo Deviation value programs the controller to sound the alarm if the
process temperature exceeds the set difference from setpoint. For example, Lo Deviation
= 5°F, Setpoint = 200°F. Lo deviation alarm will sound if the temperature cools to 195°F.
1.
The factory default is 10°. The range for the Lo Deviation is from 0°F - 50°F.
2.
Once acknowledged, press the Back button repeatedly to return to the Setpoints
screen or press the home button to return to the Home screen.
D.
Low Flow (optional feature not included on all units).
The Low Flow value programs
the controller to sound an alarm if the process flow goes below the low flow set value.
For example, if the flow set value is 3 GPM and if the flow goes below 3 GPM an alarm
condition is indicated. Note: the low flow alarm feature is only available with the purchase
of the optional flow meter.
1.
The factory default is 0 GPM. The range for the Low Flow is from 0 to 100 GPM.
2.
Once acknowledged, press the Back button repeatedly to return to the Setpoints
screen or press the home button to return to the Home screen.
3.9 INSTRUMENT : UTILITIES MENU
A.
Items in the Utilities menu include the operations for the Mold Purge, Manual Vent,
Software Version Number and Display Test.
Содержание Veteran VT LXG Series
Страница 2: ......
Страница 6: ...Page 6 THIS PAGE INTENTIONALLY BLANK ...
Страница 20: ...Page 20 THIS PAGE INTENTIONALLY BLANK ...
Страница 42: ...Page 42 THIS PAGE INTENTIONALLY BLANK ...
Страница 48: ...Page 48 THIS PAGE INTENTIONALLY BLANK ...
Страница 68: ...Page 68 THIS PAGE INTENTIONALLY BLANK ...
Страница 95: ...END 2021 TEMPTEK INC RE 20210323 ...
Страница 96: ......