ACCQPrep HP125
Section 2 Installation
2-17
Figure 2-26 Probe tubing affixed to the side of the
ACCQPrep
4. Install the included 18 mm test tube in the receptacle at
the right rear corner of the AutoSampler platform just to
the left of the wash well (Figure 2-27). Fluid in this tube
will be used for bracketed solvent injections. In this tech-
nique, the injected sample is separated from the chromato-
graphic solvents by a small amount of air and a “bracket”
solvent during the sample loading and injection process.
Figure 2-27 Location of the test tube and the wash well on
the AutoSampler
To Power on the System
The AutoSampler gets its power from the ACCQ
Prep
.
1. Turn O
N
the power switch on the AutoSampler (Figure
2-28).
Figure 2-28 On switch for the AutoSampler
Probe tubing
Wash well
18 mm Test tube
Содержание ACCQPrep HP125
Страница 2: ......
Страница 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Страница 10: ...ACCQPrep HP125 Table of Contents 4 ...
Страница 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Страница 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Страница 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Страница 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Страница 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Страница 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Страница 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Страница 136: ...A 8 This page is intentionally left blank ...
Страница 138: ......
Страница 140: ......
Страница 142: ......