ACCQPrep HP125
Section 2 Installation
2-5
3. Connect the
shorter
FEP inlet solvent line to the left side
pump’s PEEK tee. Slide the open side of the wrench
(included) over the tubing and FEP fitting and make small
turns as to not bend the tubing (Figure 2-8).
4. Connect the
longer
FEP inlet solvent line to the right side
pump’s PEEK tee. Slide the open side of the wrench
(included) over the tubing and FEP fitting and make small
turns as to not bend the tubing (Figure 2-8).
Figure 2-8 Wrench used to tighten the FEP inlet line
5. Once complete, install the faceplate onto the unit by snap-
ping the side mounted connectors into place.
2.2.3 Fluid Line Installation
Note
The solvent lines are installed at the factory and include labels
identifying the lines A1, A2, and A3 for the A solvents and line
B1, B2, and B3 for the B solvents when using the Solvent
Selector Valve Module.
1. Remove the two screws that secure the solvent lines for
shipment.
2. Place the solvent lines in the desired containers.
Содержание ACCQPrep HP125
Страница 2: ......
Страница 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Страница 10: ...ACCQPrep HP125 Table of Contents 4 ...
Страница 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Страница 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Страница 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Страница 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Страница 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Страница 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Страница 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Страница 136: ...A 8 This page is intentionally left blank ...
Страница 138: ......
Страница 140: ......
Страница 142: ......