ACCQPrep HP125
Section 2 Installation
2-3
Figure 2-3 Pump compartment with electrical connection
shown
4. When the pump assembly is most of the way in the pump
compartment, connect the electrical connections on each
side of the pump. First, connect the black connection on the
left side. Ensure the tab on top of the connector is facing up
before pushing it into the mating connector (Figure 2-4).
Figure 2-4 Black connection with tab facing up
Then, connect the white connection on the right side. Ensure the
tab on top of the connector is facing up before pushing it into the
mating connector (Figure 2-5).
Figure 2-5 White connection with tab facing up
Содержание ACCQPrep HP125
Страница 2: ......
Страница 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Страница 10: ...ACCQPrep HP125 Table of Contents 4 ...
Страница 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Страница 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Страница 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Страница 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Страница 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Страница 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Страница 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Страница 136: ...A 8 This page is intentionally left blank ...
Страница 138: ......
Страница 140: ......
Страница 142: ......