ACCQPrep HP125
Section 2 Installation
2-24
Table 2-1 Installation Qualification Checklist
Step
Section
Description
Installer
Initials
Operator
Initials
1
Unpacking the unit
2
Instrument location
3
Connect power
4
Install AutoSampler (if applicable)
5
Set up solvent lines
6
Set up waste lines
7
ELSD/PurIon connections and gas supply (if
applicable)
8
Connect and route drain lines
9
Position the system
10
Installation of the collection tube racks
11
External detector (optional)
12
Turn on the power
13
Configure the system
14
Prime the solvent lines
15
Prime AutoSampler wash station (if installed)
16
System verification
Certification of Section 2 Completion
Installer Name (print):
Installer Signature:
Date:
Operator Name (print):
Operator Signature:
Date:
Comments:
Содержание ACCQPrep HP125
Страница 2: ......
Страница 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Страница 10: ...ACCQPrep HP125 Table of Contents 4 ...
Страница 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Страница 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Страница 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Страница 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Страница 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Страница 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Страница 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Страница 136: ...A 8 This page is intentionally left blank ...
Страница 138: ......
Страница 140: ......
Страница 142: ......