ACCQPrep HP125
Section 6 Maintenance
6-19
3. Slide the new peristaltic tubing with the thicker tubing
towards the AutoSampler (Figure 6-28).
Figure 6-28 Attaching the new tubing
4. Replace the outer band of the peristaltic pump (Figure
6-29).
Figure 6-29 Replace the outer band
6.7 ELSD Maintenance
Periodic cleaning of the spray chamber will keep the
ACCQPrep operating at maximum performance. Use the
following steps if spray chamber cleaning is recommended.
6.7.1 Cleaning the ELSD
Detector
1. From the run screen select the M
ETHOD
E
DITOR
.
2. In the Peak detection window, select the ELS D
ETECTOR
radio button then select D
ETAILS
.
3. Set the spray chamber temperature to
40°C
.
4. Exit the Edit Method screen and accept the changes, then
allow approximately 5 minutes for the chamber to reach
the set temperature.
Содержание ACCQPrep HP125
Страница 2: ......
Страница 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Страница 10: ...ACCQPrep HP125 Table of Contents 4 ...
Страница 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Страница 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Страница 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Страница 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Страница 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Страница 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Страница 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Страница 136: ...A 8 This page is intentionally left blank ...
Страница 138: ......
Страница 140: ......
Страница 142: ......