
11. Remove the cable retainer and unplug the ribbon cable from the main Printed
Wiring Board (PWB).
12. Reach in through the front of the chassis past the forward bulkhead, and place
your hand under the shuttle assembly.
13. Applying a slow uniform pressure, gently lift the shuttle assembly upward.
As the assembly rises, the pinion gears turn in their vertical racks and the
shuttle gear train is gently back driven.
14. When all the pinion gears have cleared the top of their racks, tilt the far side of
shuttle assembly slightly upward and lift it out of the unit, carefully avoiding
contact with the chassis.
Tandberg SLR Autoloader Servive and Repair Manual
75