
TAC 2112, Manual
Commissioning Protocol / List of Parameters
A:4 (6), 0-004-7459-3 (GB)
1999-08-01, TAC AB
P
No.
Parameter
Min. Max. Step Default Change
Comments
P 50
P 51
P 52
P 53
P 54
P 55
P 56
P 57
P 58
P 59
P 60
P 61 Weekly program, output K4
-
-
0,5 h
00–00
see below
!
= daytime operation, K4 on
Daytime op., output K4 MO
TU
WE
TH
FR
SA
SU
off:
on:
off:
on:
P 62
Timer, ext. daytime op.
0 h
6 h
1 h
0 h
h=hours
P 63
Holiday period
1
6
1
1
P 64
Start date, holiday period
01.00
12.31
00.01
00.01
see below Weekend per. as per P 63
P 65
End date, holiday period
01.00
12.31
00.01
00.01
see below Weekend per. as per P 63
Holiday period (P 63) 1
2
3
4
5
6
start (P 64):
end (P 65):
P 66
Time format 12/24 hours
12 h
24 h
12 h
24
h=hours
P 67
Daylight saving time period
0
3
1
1
1=Mar–Sept, 2=Mar–Oct
P 68
Dayl. sav. time starts (date) 01.01
12.31
00.01
03.31
Only if P 67=3
P 69
Dayl. sav. time starts (time) 00:00
23:59
00:01
02:00
Only if P 67=3
P 70
Dayl. sav. time ends (date)
01.01
12.31
00.01
09.30
Only if P 67=3
P 71
Dayl. sav. time ends (time)
00:00
23:59
00:01
03:00
Only if P 67=3
P 72
Pump stop on/off
0 (off)
1 (on)
1
1 (on)
0=off, 1=on
P 73
Outd. temp. for pump stop
3°C
50°C
1°C
20°C
Содержание 2112
Страница 1: ...TAC 2112 Manual 0 004 7459 3 GB 1999 08 01 T1 P1...
Страница 2: ......
Страница 62: ...TAC 2112 Manual Commissioning Protocol List of Parameters A 6 6 0 004 7459 3 GB 1999 08 01 TAC AB...
Страница 66: ...TAC 2112 Manual Index Index 4 4 0 004 7459 3 GB TAC AB 1999 08 01...
Страница 68: ...TAC 2112 Manual Reply form 1999 08 01 TAC AB...
Страница 69: ......
Страница 70: ...TAC AB J gershillgatan 18 SE 213 75 MALM SWEDEN 46 40 38 68 50 www tac se...