
TAC 2112, Manual
Installation
TAC AB, 1999-08-01
0-004-7459-3 (GB), 5:7(10)
The outdoor temperature signal (Y2) is connected to the input of the
outdoor temperature sensor (B2) in the controllers (TAC 2000) which
have no outdoor sensor of their own.
If the SPC signal is connected from equipment which has a different
transformer, the G0s from each transformer must be connected to one
another.
The controller has 25 cable entries in the back. Ensure that signal
cables and mains cables are pulled through separate cable entries in
the back and are kept well apart.
Tie up the cables together in a bundle quite close to the terminal
blocks in order to limit movability.
The rail with three screws in the middle of the back is insulated. It can
be used as measurement neutral. A connection must then be made
between the rail and measurement neutral (M) in the terminal block.
Содержание 2112
Страница 1: ...TAC 2112 Manual 0 004 7459 3 GB 1999 08 01 T1 P1...
Страница 2: ......
Страница 62: ...TAC 2112 Manual Commissioning Protocol List of Parameters A 6 6 0 004 7459 3 GB 1999 08 01 TAC AB...
Страница 66: ...TAC 2112 Manual Index Index 4 4 0 004 7459 3 GB TAC AB 1999 08 01...
Страница 68: ...TAC 2112 Manual Reply form 1999 08 01 TAC AB...
Страница 69: ......
Страница 70: ...TAC AB J gershillgatan 18 SE 213 75 MALM SWEDEN 46 40 38 68 50 www tac se...