INSTRUCTION MANUAL
82
Lower the pipe down towards the roller track (keep still supported by the strap), and start
closing clamps slowly.
Ensure that the pipe will not strain the lifting strap when clamps are closed.
Ensure that the pipe is still in contact
with the forming pin and close clamps
fully.
Let the pipe weight fully off the crane
lifting strap support (strap can remain
around the pipe).
Lower the roller track so that the F-200
clamps hold the pipe, and there is a gap
between the roller track and the pipe.
Run the work cycle as required.
Lift the roller track to support the tube
and open clamps.
Use the lift trolley to detach the pipe
from the clamps.
NOTE!
¨
Always lock the wheels of the lifting trolley before moving the pipe
to the roller track!
The rolls can be removed from the track
if there is a flange on the other end of
the pipe.