INSTRUCTION MANUAL
80
NOTE!
¨
Do not push the pipe in to the machine too hard, the heavy pipe may
damage the forming pin.
Let the pipe weight fully off the crane
lifting strap support (strap can remain
around the pipe).
Lower the roller track so that the F-200
clamps hold the pipe, and there is a gap
between the roller track and the pipe.
Start work cycle.
When the work cycle is done, stop the
machine.
Lift the roller track to support the pipe
and open clamps.
Use the lift trolley to detach the pipe
from the clamps.
Lower the lift trolley and move the pipe
away from the machine opening, attach
straps and remove pipe.