![Swan Analytical Instruments AMI Turbiwell Скачать руководство пользователя страница 89](http://html1.mh-extra.com/html/swan-analytical-instruments/ami-turbiwell/ami-turbiwell_operators-manual_1411373089.webp)
A-96.250.511 / 091120
AMI Turbiwell
Program List and Explanations
89
3.4 Simulation
To simulate a value or a relay state, select the
alarm relay,
relay 1 and 2
signal output 1 and 2
with the [
] or [
] key.
Press the <Enter> key.
Change the value or state of the selected item with the [
] or
[
] key.
Press the <Enter> key.
The value is simulated by the relay/signal output.
At the absence of any key activities, the instrument will switch back
to normal mode after 20 min. If you quit the menu, all simulated val
-
ues will be reset.
3.5 Set Time
Adjust date and time.
3.6 Drainage
The following settings are only valid for instruments equipped with an
automated drain valve (auto-drain).
3.6.1
Manual operation
3.6.1.1
Motor valve
: Opening or closing of the drain valve.
Note:
Manual operation can be used anytime regardless of the
draining mode selected in menu 3.6.2.1. During a manually
started draining cycle the following applies:
• The measurement is continued normally and alarms are
issued.
• The signal outputs are set to "Hold" and the controller outputs
to "Off". The settings under 3.6.2.5 and 3.6.2.6 do not apply.
3.6.2
Parameters
3.6.2.1
Mode
: possible modes are: interval, daily, weekly, off, Input, Field
-
bus.
Alarm Relay:
Active or inactive
Relay 1 and 2:
Active or inactive
Signal Output 1 and 2:
Actual current in mA
Signal Output 3:
If option is installed actual current in mA
Содержание AMI Turbiwell
Страница 1: ...Operator s Manual Firmware V6 23 and higher AMI Turbiwell A 96 250 511 091120 ...
Страница 35: ...A 96 250 511 091120 AMI Turbiwell Installation 35 Degasser G B C Degasser sample inlet Drain Waste B G C ...
Страница 108: ...A 96 250 511 091120 AMI Turbiwell Notes 108 12 Notes ...
Страница 109: ...A 96 250 511 091120 AMI Turbiwell Notes 109 ...