![Swan Analytical Instruments AMI Turbiwell Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/swan-analytical-instruments/ami-turbiwell/ami-turbiwell_operators-manual_1411373025.webp)
A-96.250.511 / 091120
AMI Turbiwell
Installation
25
5
Put the acrylic glass tube [O] onto the base plate.
6
Insert the degasser labyrinth [N] into the acrylic glass tube.
7
Screw the degasser labyrinth into the threaded hole [P]. Do not
yet tighten firmly.
8
Align the brackets such that the guide pins are inserted in the
guide pin holes of the cover.
9
Tighten the brackets firmly.
10
Tighten the degasser labyrinth.
11
Connect the longer tube to the hose nozzle [L] and put its end
into the waste.
12
Connect the shorter tube to the hose nozzle [M] and put its end
into the constant head.
13
Connect the sample line to the elbow junction [J].
A
B
C
J
L
M
N
O
P
Star knob
Cover with guide pin holes
Guide pin
Sample inlet
Outlet to waste
Outlet to constant head
Degasser labyrinth
Acrylic glass tube
Threaded hole
A
B
C
N
O
P
J
L
M
Содержание AMI Turbiwell
Страница 1: ...Operator s Manual Firmware V6 23 and higher AMI Turbiwell A 96 250 511 091120 ...
Страница 35: ...A 96 250 511 091120 AMI Turbiwell Installation 35 Degasser G B C Degasser sample inlet Drain Waste B G C ...
Страница 108: ...A 96 250 511 091120 AMI Turbiwell Notes 108 12 Notes ...
Страница 109: ...A 96 250 511 091120 AMI Turbiwell Notes 109 ...