A-96.250.511 / 091120
AMI Turbiwell
Maintenance
73
12
Enter the turbidity of the standard as
the reference value.
13
Press [Enter].
The verification is running.
14
Press [Enter] to save.
15
Open the drainage valve.
16
Empty the measuring chamber.
17
Remove the rubber stopper.
18
Close the drainage valve.
19
Open the inlet valve.
20
Press [Enter] to finish.
3.1.2.5
Reference value
14.0 FNU
Other method
<Enter> to continue
Actual value
21.7 FNU
Progress
Reference value
21.6 FNU
Deviation
0.1%
3.1.2.5
Other method
Actual value
21.7 FNU
Reference value
21.6 FNU
Deviation
0.1%
<Enter> to save
3.1.2.5
Other method
- Open Drainage Valve.
- Empty meas. chamber.
- Remove rubber stopper.
<Enter> to continue
3.1.2.5
Other method
- Close Drainage Valve.
- Open inlet valve.
<Enter> to finish
3.1.2.5
Other method
Содержание AMI Turbiwell
Страница 1: ...Operator s Manual Firmware V6 23 and higher AMI Turbiwell A 96 250 511 091120 ...
Страница 35: ...A 96 250 511 091120 AMI Turbiwell Installation 35 Degasser G B C Degasser sample inlet Drain Waste B G C ...
Страница 108: ...A 96 250 511 091120 AMI Turbiwell Notes 108 12 Notes ...
Страница 109: ...A 96 250 511 091120 AMI Turbiwell Notes 109 ...