
Power Assisted Steering System: 6C-14
5
1) Turn the ignition switch ON with the EPS control unit
coupler disconnected, measure the voltage between
terminal “A” and terminal “B” at the coupler.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Voltage (
)
Normal value (“A” – “B”)
1.0 V and more
EPS control unit coupler (Vehicle harness end)
Is the voltage between “A” and “B” normal?
Go to Step 6.
• Inspect the wire
harness. (Faulty
indicator light wire)
• Indicator light is
blown.
6
1) Turn the ignition switch OFF.
2) Check for continuity between terminal “A” at the coupler
and body ground.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Continuity (
)
EPS control unit coupler (Vehicle harness end)
Are there continuity between “A” and body ground?
Replace the EPS
control unit.
Inspect the wire
harness. (Faulty ground
wire)
Step
Action
Yes
No
“A”
(A)
(
ޓ
)
“B”
(A)
(–)
I931G3630010-01
“A”
(A)
I931G3630011-01
Содержание 2009 LT-A750XK9
Страница 2: ......
Страница 4: ......
Страница 5: ...SUPPLEMENTS L LT A750XK9 09 MODEL 10 LT A750XPK9 09 MODEL 11 ...
Страница 29: ...0A 15 General Information 99565 01010 013 CD ROM Ver 13 ...
Страница 57: ...0B 28 Maintenance and Lubrication 09915 40610 Oil filter wrench Page 0B 12 Page 0B 12 ...
Страница 68: ...0C 11 Service Data ...
Страница 310: ...1K 5 Exhaust System ...
Страница 482: ...4D 6 Parking Brake ...
Страница 528: ...6B 13 Steering Handlebar ...
Страница 555: ...Exterior Parts 9D 1 Body and Accessories Exterior Parts Repair Instructions Exterior Parts Construction B831G29406001 ...
Страница 581: ......
Страница 631: ...4A 6 Brake Control System and Diagnosis ...